Accumulator
Definitions
Accumulator Is Usually placed at a distance of about 100 meters from the rig. Accumulator working on BOP stack with a “high pressure hydraulis” (high-pressure hydraulic lines). At the time there was a “kick” Crew can quickly close the blowout Preventer by turning the control on the accumulator or in a remote panel located on the drill floor. Accumulator unit is turned on in an emergency is to close the BOP Stack. This unit can be activated from a remote panel located on the drill floor or from the accumulator panel on this unit consists in a state crew had to leave the drill floor.
PT. UMEGA MAJU BERSAMA
Our Service
- To timely provide parts.soft goods (foreign vendor agent)
- To provide services in inspection & testing in term of maintenance after/prior us
- To do workshop repair, remanufacture and test
- To perform MIGAS certification/recertification
Our Works scope
- Repair, Recondition and Certification all of BOP
- Remanufacture of drilling equipment
- Migas re-certification
- BOP, Accumulator,and Choke Manifold rental
System and Administration
1. Quality/HSE Manuals
2. Procedures/work instructions/recording forms
Facility and equipment
1. Workshop
2. Lathe, VTL, HB Machine, etc
3. Stress relief furnace
4. Inspection tools & equipment
5. Testing equipment
6. Welding equipment
7. Hard chrome plating
8. Over Head Crane – 15 ton & 5 Ton
9. Testing Room
Personnel Competency
Competent and having more than 13 years experience inpairing & remanufacturing of drilling equipment.
Office
Jln. Raya Parung Bogor KM. 42 No. 242 Jabon Mekar, Parung Bogor 16330
Telp : +62(251) 8604392
Fax : +62(251) 8601588
Email : umegamb@yahoo.com
Contact Info
Phone : 0811-134-392
Email : umegamb@umb.co.id



